Piling without disturbing the neighbours in Stockholm

Overview

Solna Arenastaden right next to Solna railway station needed support piles for passage over railway between Arena and surrounding buildings. The urban site called for extra care and Robit products.

The work site needed some 150 piles (220/12.5) to be driven to overburden ground, which tends to ”suck the water” due to numerous fractions. What’s more, there was a large sewage passing near the worksite, let alone railway and buildings. In this environment, any pollution would be no-no as well.

Due to ground type, air drilling would almost surely cause problems to surroundings. The use of Wassara W150 ensured fast penetration and created less noise. The project was finished with minimum disturbance.

New Robit horizontal drilling equipment proves its worth in Sweden

Overview

Robit, in collaboration with our retailer Swedish retailer GDS Sverige AB, put our new HZ product series to test under a motorway ramp near Landvetter airport.

Robit has been developing the new HZ series for horizontal drilling in Sweden since the early 2011. Now, the new system was put through its paces under a motorway ramp, where a 24-meter hole of size 406.4/12.7 was drilled. The land filling under the ramp consisted partially of very large boulders. Because of the boulders and directional requirements, the drilling was a challenging test to our new HZ series.

Despite the rough terrain, the results proved successful. No problems occurred, and the drilling went as

planned. What’s more, the test drilling results have enabled the company to further improve the functionality of the HZ product line.

Lemminkäinen builds a new metro station with Robit

Overview

The so-called West Metro is a major expansion to current underground railway system in the Finnish metropolitan area, stretching it all the way to Espoo. Lemminkäinen is in charge of building the Koivusaari metro station, complete with a kilometer of tunnel. As usual, Robit delivers the goods.

The project, involving much earth-moving and digging, takes place in an urban, unforgiving environment. “The location is challenging, so it is essential that all components needed for the work have high quality and reliability”, says Annina Peisa, Construction Manager at Lemminkäinen. “Our suppliers have a substantial impact on the success of our projects”.

Lemminkäinen and Robit have been co-operating successfully for the past ten years, and this site is no exception. The installation and drilling tools required for making excavations and supporting the walls with RD piles this are supplied by Robit. Thanks to our dedicated, knowledgeable service, the construction is well on the way, and expected to be finished on time.

No wonder Peisa is pleased: “Robit is a very customer-oriented partner”, she says. “If we have any problems in our projects, Robit will provide us with quick and professional service. They will come and check the situation on site as needed.”

Customer description

Lemminkäinen is a construction group specializing in building construction, infrastructure construction and technical building services. Its main markets are Finland and the Baltic Sea region. The Group employs about 8,400 people, and its turnover in 2011 was approximately EUR 2.2 billion.

Casing Systems

Casing systems

Robit® Casing Systems are the key components of the ground drilling applications. Their patented locking system enables easy and reliable drilling cost effectively. Robit® Casing Systems have several references worldwide in all major ground drilling applications: forepoling, anchoring, piling and underpinning, horizontal drilling, water and thermal well drilling, soil investigation/ monitoring and underwater drilling.